Day 134 (Mon, 29th Feb’16): Lower Floor Roof Trusses
On the 20th week (out of the 30-weeks) of the @Clarendon_Homes construction build, finally the lower roof trusses have been installed on the garage. The perimeter fence has not been stripped down yet and is still being supported by one length of wood from falling and smashing into the windows on the right hand side of the… Read More Day 134 (Mon, 29th Feb’16): Lower Floor Roof Trusses